Corrective Action
Date of Experiment: 5th January 2022
Aim of Experiment: To Fix The Problem As Displayed Above
Aim of Experiment: To Fix The Problem As Displayed Above
Tools: (i) Adjustable Spanner 1 Unit
(ii) PTFE Thread Seal Tape 1 Roll
Method: Increase thickness of tap threaded section with sufficient amount of PTFE tape so that the tap arrives at the upright position after screwing it in tightly enough.
Method: Increase thickness of tap threaded section with sufficient amount of PTFE tape so that the tap arrives at the upright position after screwing it in tightly enough.